
The Lock Building, Manchester
The company PavePad Ltd. were in charge of laying the concrete tiles on the rooftop of The Lock Building. The Excellent PavePad system was used to support the entire concrete pavement.
The Excellent PavePad® system was used partially as support and partially to even out differences in height.
Paving: 50 x 50 concrete tiles
Excellent Systems as
Møllevej 2, Bale
DK-8544 Mørke
Tel.: +45 86377133
Fax.: +45 86377995